(1) Quality Control of Main Body Forgings: All components of this valve are forgings. The forging process is strictly executed in accordance with established forging specifications and process cards. Parameters such as initial and final forging temperatures, degree of deformation, and deformation rate are strictly controlled, and cooling is carried out according to the prescribed cooling procedures. Finished forgings undergo chemical composition analysis, mechanical property testing, intergranular corrosion testing, and metallographic examination; all results have been verified to meet the applicable standards.
The quality of the forgings is ensured through ultrasonic testing and liquid penetrant testing. In compliance with RCC-M requirements, 100% of the forgings undergo ultrasonic inspection and evaluation, and all surfaces are subjected to liquid penetrant inspection and evaluation.
(2) Welding: To enhance the quality of the hardfacing, a plasma arc welding process is employed for the sealing surfaces of the valve disc and valve seat. Furthermore, to guarantee welding integrity, the welding procedures used in production have undergone rigorous re-qualification.
(3) Assembly and Testing: High-quality products require not only high-precision components but, more importantly, the expertise to assemble these components into a high-performance final product. CNNC Sufa Valve Co., Ltd. (CNNC Sufa) assembled a highly skilled team of experienced technicians and senior craftsmen to oversee the assembly, commissioning, and testing of the valves. Detailed procedures for component cleaning and assembly were established. The team maintained strict oversight throughout the assembly and commissioning phases, striving for excellence to ensure successful completion. Comprehensive performance testing was conducted, with all parameters meeting the requirements specified in the design brief.
(4) Process Inspection: A quality plan was developed for the valves to ensure rigorous quality control at every stage-from raw materials and the introduction of forgings to machining, welding, heat treatment, non-destructive testing (NDT), cleaning, assembly, final factory testing, and various type tests. This process was approved and witnessed on-site by the Second Research and Design Institute of the Nuclear Industry.