Shijiazhuang Hanqian Technology Co., Ltd. is one of the leading manufacturers and suppliers of buried compensator in China. With abundant experience, we are committed to providing high quality customized valves with competitive price. If you're going to wholesale durable buried compensator made in China, welcome to get quotation from our factory.
Buried Expansion Joint is specially designed for underground buried pipelines. Stainless steel bellows are equipped with outer protective sleeve and prefabricated thermal insulation. It absorbs axial thermal displacement and releases thermal stress by elastic stretching of bellows, widely used in buried hot water and heating pipelines to avoid pipeline cracking caused by thermal expansion.
Working Principle
Temperature change of medium in underground pipeline causes axial expansion and contraction. Internal stainless steel bellows deform to absorb displacement and release thermal stress. Outer sleeve bears soil pressure and protects bellows from extrusion damage by soil and gravel. Insulation layer reduces heat loss.
Features
1. With outer protective sleeve to bear soil pressure for underground installation.
2. SS304 bellows with high temperature and corrosion resistance.
3. Integrated pre-insulation structure to reduce heat loss of heating pipeline.
4. Only absorbs axial displacement with stable structure.
5. Some types do not require manhole, saving civil engineering cost.
6. Built-in limit structure to avoid over-travel damage of bellows.
Specification
| Model | ZM Buried Type |
| Nominal Diameter | DN50~DN1200 |
| Nominal Pressure | PN10 / PN16 |
| Medium Temperature | -20℃~350℃ |
| Bellows Material | SS304 |
| Outer Sleeve | Q235 Carbon Steel |
| Insulation Material | Polyurethane Foam |
| Connection Type | Welded |
| Medium | Hot water, heating steam |
Applications
Urban buried heating network, residential underground heating pipelines, industrial buried high-temperature water pipelines for thermal expansion compensation.
Installation Reminder
Fixed anchor and guide supports are mandatory. Lateral force on compensator is forbidden. Backfill fine sand around joint; stones shall not directly press outer sleeve. Keep concentric during installation, torsion prohibited. Backfill can only be done after pressure test passed.
Hot Tags: buried compensator, China buried compensator manufacturers, suppliers, factory